• <button id="mows2"></button>
  • <td id="mows2"></td><small id="mows2"><li id="mows2"></li></small><li id="mows2"></li>
  • <td id="mows2"><button id="mows2"></button></td>
  • <small id="mows2"><li id="mows2"></li></small><li id="mows2"></li>
  • <td id="mows2"></td>
  • <td id="mows2"></td>
  • <td id="mows2"><button id="mows2"></button></td> <small id="mows2"><li id="mows2"></li></small>
  • <td id="mows2"></td><li id="mows2"></li><td id="mows2"><li id="mows2"></li></td>
  • <small id="mows2"><li id="mows2"></li></small><td id="mows2"><li id="mows2"></li></td>
  • <small id="mows2"></small>
  • <small id="mows2"><li id="mows2"></li></small>
  • <td id="mows2"></td> <td id="mows2"></td>
  • <small id="mows2"><li id="mows2"></li></small>
  • <td id="mows2"></td>
  • <small id="mows2"><button id="mows2"></button></small>
  • <td id="mows2"></td>
  • <small id="mows2"></small>
  • <td id="mows2"></td>
  • <small id="mows2"><li id="mows2"></li></small>
  • <small id="mows2"></small>
  • <small id="mows2"><td id="mows2"></td></small>
  • <td id="mows2"><li id="mows2"></li></td>
  • <small id="mows2"><button id="mows2"></button></small><td id="mows2"></td>
  • <td id="mows2"><button id="mows2"></button></td> <td id="mows2"></td>
  • <small id="mows2"><li id="mows2"></li></small>
  • <td id="mows2"><li id="mows2"></li></td>
  • <small id="mows2"><td id="mows2"></td></small>

    Equip Show

    XJ160 Workover Rig


    Liao Liaohe Drilling Engineering Co.,Ltd.http://www.anjouangov.com/Release Time: 2012-06-14 09:06:07

     1. Introduction   

    The Model XJ160 is a self-propelled workover rig powered by a single engine of the largest class, with a maximum static hook load of 1470kN. It is mainly used for overhauling, workover, formation testing, fishing and pump inspection operations in deep wells in onshore oilfields, which can be used for sidetracking and middle-shallow well drilling.

      

     

    2. Main Technical Parameters  

    ⑴Model

    XJ160

    Note

    ⑵Workover DepthNominal Workover Depth

    27/8″EUE Tubing 8500m

    27/8″DP

    7000m

    Nominal Overhaul Depth

    Nominal Drilling Depth

    ⑶Max. Hook Load

    1580kN

    ⑷Installed Power

    630HP(467kW)/2100r/min

    ⑸Height of Madt

    35m

    ⑹Travelling SystemEffective Numbers of Rope

    10

    Diameter of Lifting Wire Rope

    Hook Lifting Speed

    0.21.5m/s

    ⑺Rotary Table Drift Diameter

    φ520mm(201/2")

    ⑻Swivel Central Tube Drift Diameter

    φ76mm

    ⑼Drill Floor Height

    6m

     


    Relevant Equipment
    XJ135 Workover Rig
    XJ60YZ Dual-Power Self-Propelled Electro-Hydraulic Workover Rig
    XJ70 Workover Rig
    XJ110 Workover Rig
    XJ180 Workover Rig
    ? 高清在线不卡一区二区国产,久久资源网影音先锋中文字幕,女人的奶头无遮挡免费网站,最新日本免费一区二区中文,亚洲动漫卡通另类欧美小说,色偷偷免费费视频男人的天堂,欧美精品一区二区三区在线观看,日韩AV一国产AV一中文字慕,亚洲欧美曝精品手机观看