• <button id="mows2"></button>
  • <td id="mows2"></td><small id="mows2"><li id="mows2"></li></small><li id="mows2"></li>
  • <td id="mows2"><button id="mows2"></button></td>
  • <small id="mows2"><li id="mows2"></li></small><li id="mows2"></li>
  • <td id="mows2"></td>
  • <td id="mows2"></td>
  • <td id="mows2"><button id="mows2"></button></td> <small id="mows2"><li id="mows2"></li></small>
  • <td id="mows2"></td><li id="mows2"></li><td id="mows2"><li id="mows2"></li></td>
  • <small id="mows2"><li id="mows2"></li></small><td id="mows2"><li id="mows2"></li></td>
  • <small id="mows2"></small>
  • <small id="mows2"><li id="mows2"></li></small>
  • <td id="mows2"></td> <td id="mows2"></td>
  • <small id="mows2"><li id="mows2"></li></small>
  • <td id="mows2"></td>
  • <small id="mows2"><button id="mows2"></button></small>
  • <td id="mows2"></td>
  • <small id="mows2"></small>
  • <td id="mows2"></td>
  • <small id="mows2"><li id="mows2"></li></small>
  • <small id="mows2"></small>
  • <small id="mows2"><td id="mows2"></td></small>
  • <td id="mows2"><li id="mows2"></li></td>
  • <small id="mows2"><button id="mows2"></button></small><td id="mows2"></td>
  • <td id="mows2"><button id="mows2"></button></td> <td id="mows2"></td>
  • <small id="mows2"><li id="mows2"></li></small>
  • <td id="mows2"><li id="mows2"></li></td>
  • <small id="mows2"><td id="mows2"></td></small>

    Equip Show

    XJ135 Workover Rig


    Liao Liaohe Drilling Engineering Co.,Ltd.http://www.anjouangov.com/Release Time: 2012-06-14 09:30:29

    1. Introduction 

    Oil workover rig is the basic equipment in the process of oil and gas development, including XJ110, XJ135, XJ160, XJ180, XJ225 tons of various models. The workover rig is a self-propelled vehicle, which is driven by a Caterpillar diesel engine and Allison transmission box. The workover rig is controlled by mechanical, hydraulic, pneumatic and electric power. The utility model has the advantages of simple operation, reliability, safety, low labor intensity and so on. It is suitable for drilling and workover operation under various environmental conditions.

      

    2. Main Technical Parameters 

    1、Name

    135 Tons Workover Rig

    2、Model

    XJ135

    3、Max Hook Load

    1350kN

    4、Rated Hook Load

    1000 kN

    5、Hook Speed

    0-1.2m/s

    6、Diameter of Drilling Line (mm)

    Φ26mm

    7、Nominal Workover Depth  

    Workover

    27/8 Tubing 7000m

    27/8 DP 5800m

    Overhaul

    41/2 DP 3600m

    Drilling Depth

    41/2 DP 2000m

    8、Adaptable Conditions

    Altitude

    2000m

    Temperature

    -20

    Wind Speed

    No Three-Joint Unit And No Load:﹤90 Joints (46m/s)

    Full Three-Joint Unit And Full Load :﹤60 Joints (30m/s)


    Relevant Equipment
    XJ60YZ Dual-Power Self-Propelled Electro-Hydraulic Workover Rig
    XJ70 Workover Rig
    XJ110 Workover Rig
    XJ160 Workover Rig
    XJ180 Workover Rig
    ? 高清在线不卡一区二区国产,久久资源网影音先锋中文字幕,女人的奶头无遮挡免费网站,最新日本免费一区二区中文,亚洲动漫卡通另类欧美小说,色偷偷免费费视频男人的天堂,欧美精品一区二区三区在线观看,日韩AV一国产AV一中文字慕,亚洲欧美曝精品手机观看